total mu var sd
1.0000 1.7500 0.9375 0.9682
avg var
1.7475 0.9430
Discrete Random Variables and Expected Value
ADA University, School of Business
Information Communication Technologies Agency, Statistics Unit
2026-09-27
β¬ Previous lecture: 9 Β· Random Variables, Random Sampling, and Chapter 2 in Review
Watch this short intuition video before (or after) the slides. Captions (English / AzΙrbaycanca): CC button. βΆ Watch on YouTube
By the end of this lecture, you will be able to:
Identify a discrete random variable and write its probability distribution as a formula, a table or a graph
Check that a proposed \(p(y)\) is a valid distribution using Theorem 3.1
Compute \(E(Y)\), \(E[g(Y)]\), \(V(Y)\) and \(\sigma\) for a discrete distribution
Use linearity (Theorems 3.3β3.5) and \(V(Y) = E(Y^2) - \mu^2\) to shorten the arithmetic
Price a premium or compare two projects by their mean and their variance
\(Y\) is a random variable on \(S\). The event \(\{Y = 2\}\) consists of three sample points with probabilities \(0.05\), \(0.10\) and \(0.15\). What is \(P(Y = 2)\)?
Last class ended on: Chapter 3 β discrete random variables, their probability distributions, and expected value (Β§Β§3.1β3.3).
Chapter 2 gave us a random variable as a real-valued function on a sample space. Today we stop listing sample points and start working with the numbers directly.
The question this lecture answers
A motor insurer sells hail cover. Most policies never claim; a few claim a lot. What should one policy cost, and how far can a yearβs claims stray from that price?
Definition 3.1
A random variable \(Y\) is said to be discrete if it can assume only a finite or countably infinite number of distinct values.
Discrete random variables are usually counts:
Notation: \(Y\) is the random variable; \(y\) is a particular value it takes. After the hour is over, \(y\) is not random.
Definitions 3.2 and 3.3
\(P(Y = y)\) is the sum of the probabilities of all sample points in \(S\) assigned the value \(y\), written \(p(y)\) β the probability function for \(Y\). The probability distribution of \(Y\) is a formula, a table or a graph giving \(p(y)\) for all \(y\).
Theorem 3.1
For any discrete probability distribution: (1) \(0 \le p(y) \le 1\) for all \(y\); (2) \(\sum_y p(y) = 1\), summed over all \(y\) with nonzero probability.
Any \(y\) not assigned a positive probability has \(p(y) = 0\).
A new index will add 2 of 6 shortlisted Baku-listed companies, chosen at random: 3 are banks, 3 are energy firms. Let \(Y\) = number of banks added.
\(S\) has \(\binom{6}{2} = 15\) equally likely points. Counting the points assigned each value: \[p(y) = \frac{\binom{3}{y}\binom{3}{2-y}}{\binom{6}{2}}, \quad y = 0, 1, 2\]
| \(y\) | 0 | 1 | 2 |
|---|---|---|---|
| \(p(y)\) | \(3/15 = 1/5\) | \(9/15 = 3/5\) | \(3/15 = 1/5\) |
Formula, table β and each \(p(y) \in [0,1]\), summing to 1, as Theorem 3.1 requires.
Definition 3.4
The expected value of \(Y\) is \(\;E(Y) = \sum_y y\,p(y).\) If \(p(y)\) describes the population, \(E(Y) = \mu\).
Definition 3.5
The variance of \(Y\) is \(\;V(Y) = E[(Y - \mu)^2]\). The standard deviation \(\sigma\) is its positive square root.
\(E(Y)\) is a long-run average: run the experiment \(n\) times and about \(n\,p(y)\) results equal \(y\), so the average of the results is close to \(\sum_y y\,p(y)\).
\(Y\) = outages per week on an ISPβs business network in Baku.
| \(y\) | 0 | 1 | 2 | 3 |
|---|---|---|---|---|
| \(p(y)\) | \(1/8\) | \(1/4\) | \(3/8\) | \(1/4\) |
\[\mu = 0\left(\tfrac18\right) + 1\left(\tfrac14\right) + 2\left(\tfrac38\right) + 3\left(\tfrac14\right) = 1.75\]
\[\sigma^2 = (0-1.75)^2\tfrac18 + (1-1.75)^2\tfrac14 + (2-1.75)^2\tfrac38 + (3-1.75)^2\tfrac14 = 0.9375\] \(\sigma = \sqrt{0.9375} = 0.97\). The interval \(\mu \pm \sigma = (0.78, 2.72)\) holds \(y = 1, 2\): probability \(5/8\).
total mu var sd
1.0000 1.7500 0.9375 0.9682
avg var
1.7475 0.9430
\(\mu\) sits between bars, at a value \(Y\) can never take. The shaded band is \(\mu \pm \sigma\).
Theorem 3.2
\(E[g(Y)] = \sum_{\text{all } y} g(y)\,p(y)\)
The ISPβs contract credits a corporate client 0 AZN for 0 or 1 outages, 500 AZN for 2 and 1,500 AZN for 3. \[E[g(Y)] = 0\left(\tfrac18\right) + 0\left(\tfrac14\right) + 500\left(\tfrac38\right) + 1500\left(\tfrac14\right) = 562.5 \text{ AZN per week}\]
No need to derive the distribution of \(g(Y)\) first. The proof does exactly that grouping β \(P(g = 0) = 3/8\), \(P(g = 500) = 3/8\), \(P(g = 1500) = 1/4\) β and gets the same sum.
Theorems 3.3, 3.4 and 3.5
For a constant \(c\) and functions \(g, g_1, \dots, g_k\) of \(Y\): \[E(c) = c, \qquad E[c\,g(Y)] = c\,E[g(Y)],\] \[E[g_1(Y) + \cdots + g_k(Y)] = E[g_1(Y)] + \cdots + E[g_k(Y)]\]
Each proof is one line: apply Theorem 3.2, then pull the constant or split the sum. \(E(c) = c\) uses \(\sum_y p(y) = 1\) from Theorem 3.1.
Theorem 3.6
\(V(Y) = \sigma^2 = E[(Y - \mu)^2] = E(Y^2) - \mu^2\)
Expand and use 3.3β3.5: \(E(Y^2 - 2\mu Y + \mu^2) = E(Y^2) - 2\mu^2 + \mu^2\).
Example 3.3, ISP outages: \(E(Y^2) = 0 + 1\left(\tfrac14\right) + 4\left(\tfrac38\right) + 9\left(\tfrac14\right) = 4\), so \[\sigma^2 = 4 - 1.75^2 = 0.9375\] Note \(E(Y^2) = 4 \ne \mu^2 = 3.0625\): the mean of a function is not the function of the mean.
A Baku transfer office charges 1 AZN plus 2% of the amount. With \(Y\) = amount in hundreds of AZN, the fee is \(F = 2Y + 1\).
| \(y\) | 1 | 2 | 3 | 5 |
|---|---|---|---|---|
| \(p(y)\) | 0.4 | 0.3 | 0.2 | 0.1 |
\(E(Y) = 2.1\), \(E(Y^2) = 5.9\), so \(V(Y) = 5.9 - 2.1^2 = 1.49\).
From Theorems 3.3β3.6: \(E(aY + b) = a\mu + b\) and \(V(aY + b) = a^2\sigma^2\). \[E(F) = 2(2.1) + 1 = 5.2 \text{ AZN}, \qquad V(F) = 4(1.49) = 5.96, \quad \sigma_F = 2.44 \text{ AZN}\] The fixed 1 AZN moves the mean and leaves the spread alone.
One carβs hail claim \(X\) in a season: 0 (prob. 0.95), 2,000 AZN (0.04), 8,000 AZN (0.01). Admin costs 40 AZN per policy; the insurer targets an expected profit of 60 AZN. What premium \(C\)?
\(E(X) = 2000(0.04) + 8000(0.01) = 160\) AZN. Profit is \(C - 40 - X\), so by linearity \[E(\text{profit}) = C - 40 - 160 = 60 \;\Rightarrow\; C = 260 \text{ AZN}\]
\(E(X^2) = 0.04(2000^2) + 0.01(8000^2) = 800{,}000\), so \(\sigma_X = \sqrt{800{,}000 - 160^2} = 880\) AZN β more than three premiums. One policy is a gamble; the business is in pooling many.
A logistics firm runs a van \(t\) hours a day. Daily breakdowns \(Y_A\) have mean and variance \(0.10t\); \(Y_B\) has \(0.12t\). Daily cost (AZN): \(C_A = 10t + 30Y_A^2\), \(C_B = 8t + 30Y_B^2\).
The key step is Theorem 3.6 read backwards, \(E(Y^2) = V(Y) + \mu^2\): \[E(C_A) = 10t + 30[0.10t + (0.10t)^2] = 13t + 0.3t^2, \quad E(C_B) = 11.6t + 0.432t^2\]
| \(t\) | \(E(C_A)\) | \(E(C_B)\) | cheaper |
|---|---|---|---|
| 10 h | 160.0 | 159.2 | B |
| 20 h | 380.0 | 404.8 | A |
The two cross at \(t = 1.4/0.132 \approx 10.6\) hours.
A bank can finance one of two projects. NPV in millions of AZN:
| Project | Outcome 1 | Outcome 2 | Outcome 3 |
|---|---|---|---|
| P | \(-1\) (prob. 0.2) | \(2\) (prob. 0.5) | \(4\) (prob. 0.3) |
| Q | \(1\) (prob. 0.25) | \(2\) (prob. 0.5) | \(3\) (prob. 0.25) |
Four minutes, in pairs:
\(E(P) = -0.2 + 1.0 + 1.2 = 2.0\) and \(E(Q) = 0.25 + 1.0 + 0.75 = 2.0\). Same mean.
\(E(P^2) = 0.2 + 2.0 + 4.8 = 7.0\), so \(V(P) = 7.0 - 4 = 3.0\), \(\sigma_P = 1.73\). \(E(Q^2) = 0.25 + 2.0 + 2.25 = 4.5\), so \(V(Q) = 0.5\), \(\sigma_Q = 0.71\).
base = [0.15, 0.35, 0.25, 0.15, 0.05, 0.05]
pmf = base.map((b, y) => ({y: y, p: y === 1 ? b - shift : y === 5 ? b + shift : b}))
mu = d3.sum(pmf, d => d.y * d.p)
ey2 = d3.sum(pmf, d => d.y * d.y * d.p)
v = ey2 - mu * mu
md`Total **${d3.sum(pmf, d => d.p).toFixed(2)}** Β· mean **ΞΌ = ${mu.toFixed(2)}** Β· variance **ΟΒ² = ${v.toFixed(3)}** Β· Ο = ${Math.sqrt(v).toFixed(3)}`Plot.plot({
width: 1150,
height: 300,
marginTop: 40,
marginLeft: 78,
marginBottom: 58,
style: {fontSize: "18px"},
x: {label: "Complaints per hour, y", domain: [0, 1, 2, 3, 4, 5], padding: 0.15},
y: {label: "p(y)", domain: [0, 0.4], ticks: [0, 0.1, 0.2, 0.3, 0.4], tickFormat: ".1f", grid: true},
marks: [
Plot.barY(pmf, {x: "y", y: "p", fill: d => d.y === 1 || d.y === 5 ? "#8b2635" : "#8ba3c7"}),
Plot.text(pmf, {x: "y", y: "p", text: d => d.p.toFixed(2), dy: -14, fontSize: 18}),
Plot.ruleY([0])
]
})Moving 0.30 of mass four steps raises ΞΌ by \(4(0.30) = 1.2\) β but nearly doubles ΟΒ².
π The question
\(Y\) = number of down days in a five-day trading week.
π The data
Series: S&P 500 daily close (FRED SP500)
Period: Sep 2016 β Sep 2026, 425 complete five-day weeks
Model: each day down independently with probability \(\hat{p}\), so \(E(Y) = 5\hat{p}\)
sp <- read.csv("data/sp500.csv", col.names = c("date", "close"))
sp$close <- suppressWarnings(as.numeric(sp$close)) # FRED marks holidays "."
sp <- na.omit(sp)
sp$date <- as.Date(sp$date)
down <- diff(log(sp$close)) < 0
week <- format(sp$date[-1], "%Y-%W")
full <- split(down, week)[sapply(split(down, week), length) == 5]
y <- sapply(full, sum) # down days, one per week
p_hat <- mean(down)
py <- table(factor(y, levels = 0:5)) / length(y)
mu <- sum((0:5) * py) # Definition 3.4
sigma2 <- sum(((0:5) - mu)^2 * py) # Definition 3.5
round(c(weeks = length(y), p_hat = p_hat,
mu_data = mu, mu_model_5p = 5 * p_hat,
var_data = sigma2, var_model_5pq = 5 * p_hat * (1 - p_hat)), 3) weeks p_hat mu_data mu_model_5p var_data
425.000 0.452 2.256 2.262 1.193
var_model_5pq
1.239
\(E(Y)\) and \(V(Y)\) computed directly from \(p(y)\) (Definitions 3.4β3.5) sit within a few hundredths of the independence modelβs \(5\hat{p}\) and \(5\hat{p}(1-\hat{p})\).
What the data say: the shapes are close, with a mode at 2β3 down days either way. Weeks of 4 or 5 down days are a touch rarer than independence predicts, and weeks of 2β3 a touch more common β a bad day makes the next one only slightly more likely to be bad, not enough to shift the picture much.
Which of these can be the probability function of complaints per hour, \(y = 0, 1, 2, 3\)?
A small fleet files \(Y\) = 0, 1 or 2 hail claims in a season, with probabilities 0.5, 0.3, 0.2. What is \(E(Y)\)?
\(V(Y) = 4\) for a transfer amount \(Y\). The fee is \(F = 3Y + 5\) AZN. What is \(V(F)\)?
| Statement | |
|---|---|
| Theorem 3.1 | \(0 \le p(y) \le 1\), \(\;\sum_y p(y) = 1\) |
| Definition 3.4 | \(E(Y) = \sum_y y\,p(y)\) |
| Theorem 3.2 | \(E[g(Y)] = \sum_y g(y)\,p(y)\) |
| Definition 3.5 | \(V(Y) = E[(Y - \mu)^2]\), \(\;\sigma = \sqrt{V(Y)}\) |
| Theorems 3.3β3.5 | \(E(c) = c\), \(\;E[cg(Y)] = cE[g(Y)]\), \(\;E\) of a sum is the sum of \(E\) |
| Theorem 3.6 | \(V(Y) = E(Y^2) - \mu^2\) |
| consequence | \(E(aY + b) = a\mu + b\), \(\;V(aY + b) = a^2\sigma^2\) |
A discrete random variable takes countably many values; its distribution is \(p(y)\) as a formula, a table or a graph
Theorem 3.1 is the validity check: every \(p(y)\) in \([0, 1]\), total 1
\(E(Y)\) is a probability-weighted average β a premium is built on it
\(V(Y)\) measures what the mean hides: two projects with the same mean can carry very different risk
Linearity and \(E(Y^2) - \mu^2\) turn most calculations into two sums
Wackerly, 7th edition
Week 5, Problem Set 2 is open now and closes Sunday 18 October at 23:59 on WeBWorK, covering Β§Β§3.1β3.3. The TA-led tutorial runs this week.
Quiz I is on 17 October, first 30 minutes of class, on Chapters 1β2 β todayβs material is not on it, but it is on Midterm I (24 October).
Next class: Β§3.4 β the binomial distribution.
Dr. Samir Orujov
π§ sorujov@ada.edu.az
π’ Building D, Room D325
π Office hours: Wednesday, 16:00 β 18:00
Slides and readings: sorujov.net/teaching
Can \(E(Y)\) be a value that \(Y\) never takes? Can \(V(Y)\) ever be negative?
A premium is set at \(E(X)\) plus costs. Why does an insurer with 50 policies charge more than one with 50,000?
When is \(E[g(Y)] = g(E(Y))\) exactly true?

Mathematical Statistics I - Discrete Random Variables and Expected Value